Optimized Steam Sootblowing

Upgrade your asset beyond technical specification. Sootblow more, with less steam

optimized steam sootblowing on a recovery boiler
Recovery boiler illustration

Optimized Steam Sootblowing

Upgrade your asset beyond technical specification. Sootblow more, with less steam

optimized steam sootblowing on a recovery boiler

General info

Sootblow more, with less steam

More than 90% of the cleaning by a sootblower takes place during the sootblower’s initial stroke.

When the sootblower is retracted, 50% of the steam is used unnecessarily at the same time as the soft ash is sintered into concrete-like deposits.

With HISS (High Impact Sootblowing System), several sootblowers can be operated in parallel with or without return steam, i.e. more sootblowing, less steam, more easily removed ash.

Download product sheet
Download implementation guide

About HISS

HISS transforms your steam sootblowing system

The patented HISS technology transforms your steam sootblowing system into an effective tool that handles clogging and increases the efficiency of your power and recovery boilers.

  • Halve your steam consumption
  • Increase your production of electricity
  • Double your sootblowing power
  • Use cheaper fuel

Works on all soot blower valves/brands. Rosink, Clyde Bergemann, Diamond Power etc.

Key facts

Optimized steam 100

Sootblowing capacity increased 100 % more starts/day, without installing new sootblowers

optimized steam 45

Reduced steam consumption by 45% per sootblower

optimized steam engineer

Beyond technical specification – One year process follow-up increases boiler availability and efficiency

Key facts

Optimized steam 100

Sootblowing capacity increased 100 % more starts/day, without installing new sootblowers

optimized steam 45

Reduced steam consumption by 45 % per sootblower

optimized steam engineer

Beyond technical specification – One-year process follow-up increases boiler availability and efficiency

Case studies from HISS installations

2020-12-17T12:17:28+00:00

BillerudKorsnäs Gruvön, Sweden

A case study and report from our HISS installation on the Recovery boiler at BillerudKorsnäs Gruvön. All 80 steam sootblowers were rebuilt in 2016 with Heat Managements patented solution using local actuator controlling the steam poppet valves on the sootblowers, together with upgraded software for monitoring/controlling the sootblowers.