
Situation description
Situation description

Situation description
The customer’s Götaverken recovery boiler, commissioned in 1976 and upgraded to 2,600 tDS/day (from 1,900 tDS/day), operates at 350 t/h with sootblowers consuming about 27 t/h (7.5%). To improve efficiency, HISS® technology was implemented in June 2024 to optimize online cleaning, reduce sootblowing steam use, and raise main steam temperature while maintaining high availability.
Between January 2023 and June 2025, sootblowing steam flow decreased by 34%, while boiler load and steam to the turbine increased. Although the reference period showed unusually low load and a longer start-up, HISS® has proven effective by minimizing unnecessary sootblowing at partial load, improving steam utilization and overall boiler performance.
NEWSLETTER
Get the latest news about Heat Management and rewarding articles about the industry
Sundbybergs torg 1H
172 67
Sundbyberg
Sweden

Latest news
About us
Contact us
Privacy policy
Operation policies
Career
Newsletter
info@heatmanage.com
+46 8-661 33 10
Sundbybergs torg 1H
172 67
Sundbyberg
Sweden
