Descrição da situação
Keeping clean the economizer and air preheater required extensive steam soot blowing, 5-6 times per 24 hours. The infrasound generators were installed at Sudzucker to minimize the need for soot blowing and to prepare the boiler for planned boiler load increase.
Download the report to get the results
Baixar relatório
Descrição da situação
Keeping clean the economizer and air preheater required extensive steam soot blowing, 5-6 times per 24 hours. The infrasound generators at Sudzucker were installed to minimize the need for soot blowing and to prepare the boiler for planned boiler load increase.
Download the report to get the results