Gestión del calor

Sudzucker, Zeitz Alemania

Aplicación Caldera de carbón

Sudzucker, Zeitz Alemania

Aplicación Caldera de carbón

Descripción de la situación

Keeping clean the economizer and air preheater required extensive steam soot blowing, 5-6 times per 24 hours. The infrasound generators were installed at Sudzucker to minimize the need for soot blowing and to prepare the boiler for planned boiler load increase.

Descargue el informe para obtener los resultados

Descargar informe