Situationbeschreibung
Keeping clean the economizer and air preheater required extensive steam soot blowing, 5-6 times per 24 hours. The infrasound generators were installed at Sudzucker to minimize the need for soot blowing and to prepare the boiler for planned boiler load increase.
Laden Sie den Bericht herunter, um die Ergebnisse zu erhalten
Download des Berichts
Situationbeschreibung
Keeping clean the economizer and air preheater required extensive steam soot blowing, 5-6 times per 24 hours. The infrasound generators at Sudzucker were installed to minimize the need for soot blowing and to prepare the boiler for planned boiler load increase.
Laden Sie den Bericht herunter, um die Ergebnisse zu erhalten