Jönköping Energi torsvik

Jönköping Energi, Sweden

Application: BFB Boiler

Jönköping Energi, Sweden

Application: BFB Boiler

Situation description

In 2023, the Swedish power plant Jönköping Energi initiated a project that enabled them to increase their boiler load with biofuel. The outcome of that project was a significant increase in heat and electricity production. This however significantly increased their need for sootblowing. Jönköpings Energi discovered that even though they had to be sootblowing more as a consequence of increasing their boiler load, there was an add-on solution to their sootblowers that could save them time and steam for each cycle. The High Impact Sootblowing System (HISSTM).

Download report

Situation description

In 2023, the Swedish power plant Jönköping Energi initiated a project that enabled them to increase their boiler load with biofuel. The outcome of that project was a significant increase in heat and electricity production. This however significantly increased their need for sootblowing. Jönköpings Energi discovered that even though they had to be sootblowing more as a consequence of increasing their boiler load, there was an add-on solution to their sootblowers that could save them time and steam for each cycle. The High Impact Sootblowing System (HISSTM).

Download report