Gestione termica

Sudzucker, Zeitz Germany

Applicazione Caldaia a carbone

Sudzucker, Zeitz Germany

Applicazione Caldaia a carbone

Descrizione della situazione

Keeping clean the economizer and air preheater required extensive steam soot blowing, 5-6 times per 24 hours. The infrasound generators were installed at Sudzucker to minimize the need for soot blowing and to prepare the boiler for planned boiler load increase.

Download the report to get the results

Scarica il rapporto

Descrizione della situazione

Keeping clean the economizer and air preheater required extensive steam soot blowing, 5-6 times per 24 hours. The infrasound generators at Sudzucker were installed to minimize the need for soot blowing and to prepare the boiler for planned boiler load increase.

Download the report to get the results

Scarica il rapporto