
Nhà máy bột giấy, Thụy Điển
Ứng dụng Recovery Boiler
Mô tả tình huống
Mô tả tình huống

Mô tả tình huống
The customer’s Götaverken recovery boiler, commissioned in 1976 and upgraded to 2,600 tDS/day (from 1,900 tDS/day), operates at 350 t/h with sootblowers consuming about 27 t/h (7.5%). To improve efficiency, HISS® technology was implemented in June 2024 to optimize online cleaning, reduce sootblowing steam use, and raise main steam temperature while maintaining high availability.
Between January 2023 and June 2025, sootblowing steam flow decreased by 34%, while boiler load and steam to the turbine increased. Although the reference period showed unusually low load and a longer start-up, HISS® has proven effective by minimizing unnecessary sootblowing at partial load, improving steam utilization and overall boiler performance.
BẢN TIN
Nhận các tin tức mới nhất về Quản lý Nhiệt và các bài viết bổ ích về ngành công nghiệp này
Sundbybergs torg 1H
172 67
Sundbyberg
Thụy Điển

Tin mới nhất
Về chúng tôi
Liên hệ với chúng tôi
Chính sách quyền riêng tư
Chính sách vận hành
Sự nghiệp
Bản tin
info@heatmanage.com
+46 8-661 33 10
Sundbybergs torg 1H
172 67
Sundbyberg
Thụy Điển
