
Situationsbeskrivning
Situationsbeskrivning

Situationsbeskrivning
The customer’s Götaverken recovery boiler, commissioned in 1976 and upgraded to 2,600 tDS/day (from 1,900 tDS/day), operates at 350 t/h with sootblowers consuming about 27 t/h (7.5%). To improve efficiency, HISS® technology was implemented in June 2024 to optimize online cleaning, reduce sootblowing steam use, and raise main steam temperature while maintaining high availability.
Between January 2023 and June 2025, sootblowing steam flow decreased by 34%, while boiler load and steam to the turbine increased. Although the reference period showed unusually low load and a longer start-up, HISS® has proven effective by minimizing unnecessary sootblowing at partial load, improving steam utilization and overall boiler performance.
NYHETSBREV
Få de senaste nyheterna om Heat Management och givande artiklar om branschen
Sundbybergs torg 1H
172 67
Sundbyberg
Sverige

Senaste nytt
Om oss
Kontakta oss
Integritetspolicy
Driftspolicy
Karriär
Nyhetsbrev
info@heatmanage.com
+46 8-661 33 10
Sundbybergs torg 1H
172 67
Sundbyberg
Sverige
