Heat Management

Nässjö Affärsverk RP12, Nässjö Sweden

Application: Biomass boiler

Nässjö Affärsverk RP12, Nässjö Sweden

Application: Biomass boiler

Download the full case study

Verified results and operating data. Enter your email and the report opens directly.

Situation description

Compressed air soot blowing is installed at Nässjö Affärsverk, but relatively ineffective because of the valves being mounted on the turning chamber, far away from the problem area. This results in the air pressure not reaching the problem area.

Download the report to get the results

Situation description

Compressed air soot blowing is installed at Nässjö Affärsverk, but relatively ineffective because of the valves being mounted on the turning chamber, far away from the problem area. This results in the air pressure not reaching the problem area.

Download the report to get the results