Optimeret dampSodblæsning2025-11-13T02:16:31+01:00
Recovery boiler illustration

Optimized Steam Sootblowing

Upgrade your asset beyond technical specification. Sootblow more, with less steam

optimized steam sootblowing on a recovery boiler

Generelle oplysninger

Sootblow more, with less steam

More than 90% of the cleaning by a sootblower takes place during the sootblower’s initial stroke.

When the sootblower is retracted, 50% of the steam is used unnecessarily while the soft ash is sintered into concrete-like deposits.

With HISS® (High Impact Sootblowing System), several sootblowers can be operated in parallel with or without return steam, i.e. more sootblowing, less steam, more easily removed ash.

See how it works

About HISS

HISS transforms your steam sootblowing system

The patented HISS® technology transforms your steam sootblowing system into an effective tool that handles clogging and increases the efficiency of your power and recovery boilers.

  • Halve your steam consumption
  • Increase your production of electricity
  • Double your sootblowing power
  • Use cheaper fuel

Works on all soot blower valves/brands. Rosink, Clyde Bergemann, Diamond Power etc.

New: Multi-position Actuator

Three positions. One retrofit.

Direct valve control that maintains Cooling Steam Flow in hot sections and switches to Full Cleaning Flow on demand—without replacing your existing mechanisms. Expect smoother runs, cleaner surfaces, reduced tube erosion due to condensate, and fewer surprises.

  • Prevent problems arising from worn out valve opening mechanism
  • Increase lifetime of lance and packing gland
  • Lowers steam valve wear
  • Increases boiler availability

Piloted at a Swedish paper mill.

Key facts

Optimized steam 100

100% increase

In sootblowing capacity, without installing new sootblowers, or consuming more steam.

optimized steam 45

45 % reduction

In steam consumption, per sootblower.

optimized steam engineer

Ud over de tekniske specifikationer

One year process follow-up increases boiler availability and efficiency

Do you want to optimize your sootblowers?

Talk to one of our experts to see if our renowned High Impact Sootblowing System would be fitting for you.

Case studies from HISS installations

2026-09-10T10:35:43+02:00

Papirfabrik, Ungarn

I 2024 indgik Heat Management et partnerskab med et ungarsk papirværk for at støtte optimeringen af deres kedeldrift. Implementeringen af HISS® markerede et strategisk skridt i retning af at forbedre rengøringseffektiviteten, forlænge udstyrets levetid og understøtte en mere stabil og omkostningseffektiv kedeldrift.

2026-05-11T13:50:24+02:00

Pulp Mill, Sweden

The customer’s Götaverken recovery boiler, commissioned in 1976 and upgraded to 2,600 tDS/day (from 1,900 tDS/day), operates at 350 t/h with sootblowers consuming about 27 t/h (7.5%). To improve efficiency, HISS® technology was implemented in June 2024 to optimize online cleaning, reduce sootblowing steam use, and raise main steam temperature while maintaining high availability.

Content related to HISS

2026-05-13T09:42:52+02:00

Udfordringer for kedler

Denne hvidbog fokuserer primært på udfordringer i forbindelse med forbrænding af komplekse brændsler såsom husholdningsaffald, industriaffald og nedrivningsaffald. I det første kapitel vil vi præsentere udfordringerne samt løsninger til at øge kedlernes effektivitet og renlighed.

Articles related to Optimized steam sootblowing

Gå til top