Descripción de la situación

Initially there were 4 layers in the catalysts at HEW Tiefstack. No soot cleaning equipment was installed from the beginning, since the boiler manufacturer Steinmüller was convinced, that by guiding the flue gas in parallel, the cat stones would not become dirty. The catalyst reactor was also built by Steinmüller.

Download report for complete results

Descargar informe

Descripción de la situación

Initially there were 4 layers in the catalysts at HEW Tiefstack. No soot cleaning equipment was installed from the beginning, since the boiler manufacturer Steinmüller was convinced, that by guiding the flue gas in parallel, the cat stones would not become dirty. The catalyst reactor was also built by Steinmüller.