Kraftvärmeverket Eskilstuna, Sweden

Ansökan Biomassapanna

Kraftvärmeverket Eskilstuna, Eskilstuna Sweden

Ansökan Biomassapanna

Situationsbeskrivning

The 110 MW boiler supplies Eskilstuna with district heating and power.

Before the installation, the primary superheater had large deposits that built up between the tubes. In the duct after the economizer, there was a 200 mm thick layer of dust.

The goal was to clean the primary superheater and ducts.

Ladda ner rapporten för mer information och resultat

Ladda ner rapport

Situationsbeskrivning

The 110 MW boiler supplies Eskilstuna with district heating and power.

Before the installation, the primary superheater had large deposits that built up between the tubes. In the duct after the economizer, there was a 200 mm thick layer of dust.

The goal was to clean the primary superheater and ducts.

Ladda ner rapporten för mer information och resultat

Ladda ner rapport