{"id":888,"date":"2020-12-01T10:16:05","date_gmt":"2020-12-01T10:16:05","guid":{"rendered":"https:\/\/heatmanage.com\/?p=888"},"modified":"2020-12-06T17:27:28","modified_gmt":"2020-12-06T17:27:28","slug":"otimizar-os-sistemas-de-aspiracao-de-fuligem-a-vapor","status":"publish","type":"post","link":"https:\/\/heatmanage.com\/pt\/optimized-steam-sootblowing-articles\/optimize-steam-sootblowing-systems\/","title":{"rendered":"Como otimizamos os sistemas de aspira\u00e7\u00e3o de fuligem a vapor"},"content":{"rendered":"<h2><a href=\"\/pt\/products\/desenvolvido-para-otimizar-a-aspiracao-de-fuligem-a-vapor\/\">Sistema de sopro de cinzas de alto impacto<\/a><\/h2>\n<p>Procedimento geral de instala\u00e7\u00e3o<\/p>\n<p>A seguir, descreve-se as medidas necess\u00e1rias para a implementa\u00e7\u00e3o do Sistema de Poeira de Alto Impacto (HISS), com o objetivo de otimizar o funcionamento do ventilador de poeira de vapor e do caldeir\u00e3o de recupera\u00e7\u00e3o.<\/p>\n<h3><b>\u00a0Passo 1 \u2013 Instale o atuador pneum\u00e1tico nos sopradores de fuligem a vapor<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">A instala\u00e7\u00e3o leva aproximadamente 10 a 15 minutos por ventilador e pode ser realizada durante a opera\u00e7\u00e3o do caldeir\u00e3o. Os atuadores podem ser desativados com um pin de bloqueio.<\/span><\/p>\n<h3><b>Passo 2 \u2013 Instale as caixas de controle pneum\u00e1ticas para o HISS<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Os atuadores s\u00e3o acionados com ar de instrumentos a uma press\u00e3o de ~6 bar e s\u00e3o distribu\u00eddos aos sopradores de fuligem atrav\u00e9s de caixas de controle pneum\u00e1ticas. Cada caixa de controle pode controlar at\u00e9 12 sopradores de fuligem.<\/span><\/p>\n<h3><b>Passo 3 \u2013 Instale os controladores ACABBM 800M para os atuadores<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Os contactores dos sopradores de fuligem s\u00e3o substitu\u00eddos por novos, com controlo de dire\u00e7\u00e3o. Al\u00e9m disso, \u00e9 instalado um controlador ACABBM 800M. Estes constituem os comandos da fun\u00e7\u00e3o HISS.<\/span><\/p>\n<h3><b>Passo 4 \u2013 Implementa\u00e7\u00e3o do visor de controle do operador<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">O visor de controle do ventilador de fuligem no DCS \u00e9 a ferramenta mais poderosa para colocar o poder do HISS ao alcance dos operadores. O visor de controle \u00e9 feito sob medida para cada caldeira espec\u00edfica e aumenta a monitora\u00e7\u00e3o do funcionamento e do estado do ventilador de fuligem individual.<\/span><\/p>\n<h3><b>Passo 5 \u2013 Implementar o software de controle de part\u00edculas (Soot Power Control)<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">A distribui\u00e7\u00e3o da capacidade de sopro de fuligem \u00e9 feita alterando a porcentagem por soprador de fuligem. O software calcula automaticamente novamente o n\u00famero de partidas para at\u00e9 mesmo intervalos. Gra\u00e7as \u00e0 tecnologia HISS, o n\u00famero de partidas aumentou em 100%, proporcionando ao operador uma excelente vis\u00e3o geral do programa de sopro de fuligem atual. Os operadores agora podem redistribuir rapidamente a sopra\u00e7\u00e3o de fuligem para diferentes partes do caldeir\u00e3o, dependendo das condi\u00e7\u00f5es atuais.<\/span><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>High Impact Sootblowing System General Installation Procedure Below describes the measures necessary for the implementation of the High Impact Soot System (HISS), for the optimization of steam soot blower and recovery boiler operation. \u00a0Step 1 \u2013 Install pneumatic actuator on the steam soot blowers The installation takes approximately 10 \u2013 15 min per blower and can be performed during boiler operation. The actuators can be bypassed with a blocking pin. Step 2 \u2013 Install pneumatic control boxes for HISS The actuators are operated with instrument air at ~6 bar and is distributed to the soot blowers, through pneumatic control boxes. Each control box can handle up to 12 soot blowers. Step 3 \u2013 Install ACABBM 800M controllers for the actuators The contactors for the soot blowers are replaced with new ones, with direction control. Furthermore, an ACABBM 800M controller is installed. This make up the controls for the HISS-function. Step 4 \u2013 Implementation of operator control display The soot blower  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":893,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[51],"tags":[],"class_list":["post-888","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-optimized-steam-sootblowing-articles"],"_links":{"self":[{"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/posts\/888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/comments?post=888"}],"version-history":[{"count":3,"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/posts\/888\/revisions"}],"predecessor-version":[{"id":1222,"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/posts\/888\/revisions\/1222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/media\/893"}],"wp:attachment":[{"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/media?parent=888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/categories?post=888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/heatmanage.com\/pt\/wp-json\/wp\/v2\/tags?post=888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}