{"id":888,"date":"2020-12-01T10:16:05","date_gmt":"2020-12-01T10:16:05","guid":{"rendered":"https:\/\/heatmanage.com\/?p=888"},"modified":"2020-12-06T17:27:28","modified_gmt":"2020-12-06T17:27:28","slug":"optimoi-hoyryhiukkasten-puhallusjarjestelmat","status":"publish","type":"post","link":"https:\/\/heatmanage.com\/fi\/optimized-steam-sootblowing-articles\/optimize-steam-sootblowing-systems\/","title":{"rendered":"Miten optimoimme h\u00f6yryhiilipuhdistusj\u00e4rjestelmi\u00e4"},"content":{"rendered":"<h2><a href=\"\/fi\/products\/optimoitu-hoyrynoenpoisto\/\">Korkean iskun savupurkausj\u00e4rjestelm\u00e4<\/a><\/h2>\n<p>Yleinen asennusmenetelm\u00e4<\/p>\n<p>Alla kuvataan toimenpiteet, jotka ovat tarpeen High Impact Soot System (HISS) -j\u00e4rjestelm\u00e4n k\u00e4ytt\u00f6\u00f6noton ja h\u00f6yryhiukkasuihkukoneen sek\u00e4 talteenotto-uunien toiminnan optimoinnin kannalta.<\/p>\n<h3><b>\u00a0Vaihe 1 \u2013 Paineilmajousitus asennetaan h\u00f6yryhiukkasuihkukoneisiin<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Asennus vie noin 10\u201315 minuuttia per puhallin ja se voidaan suorittaa kattiloiden k\u00e4yt\u00f6n aikana. K\u00e4ytt\u00f6liittimet voidaan ohjata pois k\u00e4yt\u00f6st\u00e4 lukitusnappulalla.<\/span><\/p>\n<h3><b>Vaihe 2 \u2013 Asenna pneumaattiset ohjauskeskukset HISS-j\u00e4rjestelm\u00e4\u00e4n<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">K\u00e4ytt\u00f6voimaj\u00e4rjestelm\u00e4n toiminta tapahtuu instrumenttiliikenteell\u00e4 ~6 barin paineella ja se jaetaan tuhkapuhaltimien v\u00e4lityksell\u00e4 pneumaattisilla ohjauslaiteissa. Jokaisella ohjauslaitteella voidaan ohjata jopa 12 tuhkapuhaltinta.<\/span><\/p>\n<h3><b>Vaihe 3 \u2013 Asenna ACABBM 800M -ohjaimet toimilaitteisiin<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Polttohiukkasuihkulaitteiden kontaktorit vaihdetaan uusiksi, ja niihin on asennettu suunnanohjaus. Lis\u00e4ksi asennetaan ACABBM 800M -ohjain. N\u00e4in muodostetaan HISS-toiminnon ohjausj\u00e4rjestelm\u00e4.<\/span><\/p>\n<h3><b>Vaihe 4 \u2013 K\u00e4ytt\u00e4j\u00e4nohjausn\u00e4yt\u00f6n k\u00e4ytt\u00f6\u00f6notto<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">DCS:n savpuhdistinohjausn\u00e4ytt\u00f6 on tehokkain ty\u00f6kalu, jonka avulla HISS:n toimintoja voidaan k\u00e4ytt\u00e4\u00e4 k\u00e4ytt\u00e4jien ulottuvilla. Ohjausn\u00e4ytt\u00f6 on r\u00e4\u00e4t\u00e4l\u00f6ity jokaisen yksil\u00f6llisen kattilan mukaan ja parantaa yksitt\u00e4isten savpuhdistimen toiminnan ja tilan seurantaa.<\/span><\/p>\n<h3><b>Vaihe 5 \u2013 K\u00e4yt\u00e4 prosentuaalisen savun puhallusohjelmistoa (Soot Power Control)<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Polttoh\u00f6yryn puhalluskyvyn jakautuminen tapahtuu muuttamalla polttoh\u00f6yryn puhallusprosenttia. Ohjelmisto laskee automaattisesti uudelleen k\u00e4ynnistysm\u00e4\u00e4r\u00e4t jopa v\u00e4liarvoon. HISS-tekniikan ansiosta k\u00e4ynnistysm\u00e4\u00e4r\u00e4t ovat kasvaneet 100%:lla, samalla kuitenkin tarjoten k\u00e4ytt\u00e4j\u00e4lle erinomaisen yleiskuvan nykyisest\u00e4 polttoh\u00f6yryn puhallustehokkuudesta. K\u00e4ytt\u00e4j\u00e4t voivat nyt jakaa polttoh\u00f6yryn uudelleen eri osiin kattilaa nykyisten olosuhteiden mukaan.<\/span><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>High Impact Sootblowing System General Installation Procedure Below describes the measures necessary for the implementation of the High Impact Soot System (HISS), for the optimization of steam soot blower and recovery boiler operation. \u00a0Step 1 \u2013 Install pneumatic actuator on the steam soot blowers The installation takes approximately 10 \u2013 15 min per blower and can be performed during boiler operation. The actuators can be bypassed with a blocking pin. Step 2 \u2013 Install pneumatic control boxes for HISS The actuators are operated with instrument air at ~6 bar and is distributed to the soot blowers, through pneumatic control boxes. Each control box can handle up to 12 soot blowers. Step 3 \u2013 Install ACABBM 800M controllers for the actuators The contactors for the soot blowers are replaced with new ones, with direction control. Furthermore, an ACABBM 800M controller is installed. This make up the controls for the HISS-function. Step 4 \u2013 Implementation of operator control display The soot blower  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":893,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[51],"tags":[],"class_list":["post-888","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-optimized-steam-sootblowing-articles"],"_links":{"self":[{"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/posts\/888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/comments?post=888"}],"version-history":[{"count":3,"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/posts\/888\/revisions"}],"predecessor-version":[{"id":1222,"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/posts\/888\/revisions\/1222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/media\/893"}],"wp:attachment":[{"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/media?parent=888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/categories?post=888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/heatmanage.com\/fi\/wp-json\/wp\/v2\/tags?post=888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}