{"id":888,"date":"2020-12-01T10:16:05","date_gmt":"2020-12-01T10:16:05","guid":{"rendered":"https:\/\/heatmanage.com\/?p=888"},"modified":"2020-12-06T17:27:28","modified_gmt":"2020-12-06T17:27:28","slug":"optimizar-los-sistemas-de-aspiracion-de-hollin-por-vapor","status":"publish","type":"post","link":"https:\/\/heatmanage.com\/es\/optimized-steam-sootblowing-articles\/optimize-steam-sootblowing-systems\/","title":{"rendered":"C\u00f3mo optimizamos los sistemas de aspiraci\u00f3n de holl\u00edn por vapor"},"content":{"rendered":"<h2><a href=\"\/es\/products\/soplado-de-hollin-con-vapor-optimizado\/\">Sistema de soplado de ceniza de alto impacto<\/a><\/h2>\n<p>Procedimiento general de instalaci\u00f3n<\/p>\n<p>A continuaci\u00f3n se describen las medidas necesarias para la implementaci\u00f3n del Sistema de Soot de Alto Impacto (HISS), con el fin de optimizar el funcionamiento del ventilador de soot de vapor y el caldero de recuperaci\u00f3n.<\/p>\n<h3><b>\u00a0Paso 1 \u2013 Instale un actuador neum\u00e1tico en los sopladores de holl\u00edn de vapor<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">La instalaci\u00f3n tarda aproximadamente 10 a 15 minutos por ventilador y se puede realizar durante la operaci\u00f3n del caldero. Los actuadores pueden ser anulados mediante un pasador de bloqueo.<\/span><\/p>\n<h3><b>Pas 2 \u2013 Instale cajas de control neum\u00e1ticas para el HISS<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Los actuadores se accionan con aire de instrumentos a una presi\u00f3n de ~6 bar y se distribuyen a los sopladores de holl\u00edn a trav\u00e9s de cajas de control neum\u00e1ticas. Cada caja de control puede manejar hasta 12 sopladores de holl\u00edn.<\/span><\/p>\n<h3><b>Paso 3 \u2013 Instale los controladores ACABBM 800M para los actuadores<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Los contactores de los ventiladores de suciedad se sustituyen por nuevos, con control de direcci\u00f3n. Adem\u00e1s, se instala un controlador ACABBM 800M. Esto constituye el control de la funci\u00f3n HISS.<\/span><\/p>\n<h3><b>Pas 4 \u2013 Implementaci\u00f3n de la pantalla de control del operador<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">La pantalla de control del ventilador de holl\u00edn en el DCS es la herramienta m\u00e1s potente para poner la potencia del HISS al alcance de los operadores. La pantalla de control est\u00e1 dise\u00f1ada a medida para cada caldera espec\u00edfica y aumenta la supervisi\u00f3n del funcionamiento y el estado individual del ventilador de holl\u00edn.<\/span><\/p>\n<h3><b>Paso 5 \u2013 Implementar el software de control de la combusti\u00f3n de la ceniza (Soot Power Control)<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">La distribuci\u00f3n de la capacidad de soplado de holl\u00edn se realiza cambiando el porcentaje por soplador de holl\u00edn. El software calcula autom\u00e1ticamente de nuevo el n\u00famero de arrancadas para un intervalo incluso. Gracias a la tecnolog\u00eda HISS, el n\u00famero de arrancadas se ha incrementado en 100%, mientras que proporciona al operador una excelente visi\u00f3n general del programa actual de soplado de holl\u00edn. Los operadores ahora pueden redistribuir r\u00e1pidamente el soplado de holl\u00edn a diferentes partes del caldero, en funci\u00f3n de las condiciones actuales.<\/span><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>High Impact Sootblowing System General Installation Procedure Below describes the measures necessary for the implementation of the High Impact Soot System (HISS), for the optimization of steam soot blower and recovery boiler operation. \u00a0Step 1 \u2013 Install pneumatic actuator on the steam soot blowers The installation takes approximately 10 \u2013 15 min per blower and can be performed during boiler operation. The actuators can be bypassed with a blocking pin. Step 2 \u2013 Install pneumatic control boxes for HISS The actuators are operated with instrument air at ~6 bar and is distributed to the soot blowers, through pneumatic control boxes. Each control box can handle up to 12 soot blowers. Step 3 \u2013 Install ACABBM 800M controllers for the actuators The contactors for the soot blowers are replaced with new ones, with direction control. Furthermore, an ACABBM 800M controller is installed. This make up the controls for the HISS-function. Step 4 \u2013 Implementation of operator control display The soot blower  [&#8230;]<\/p>\n","protected":false},"author":1,"featured_media":893,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","footnotes":""},"categories":[51],"tags":[],"class_list":["post-888","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-optimized-steam-sootblowing-articles"],"_links":{"self":[{"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/posts\/888","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/comments?post=888"}],"version-history":[{"count":3,"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/posts\/888\/revisions"}],"predecessor-version":[{"id":1222,"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/posts\/888\/revisions\/1222"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/media\/893"}],"wp:attachment":[{"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/media?parent=888"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/categories?post=888"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/heatmanage.com\/es\/wp-json\/wp\/v2\/tags?post=888"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}